Client: Auragen OÜ

Location: Tallinn, Estonia

Project period: 2014-2017

Fuel: biofuel (wood chips, logging waste etc.) and 15% peat

Thermal capacity of power: 76.5 MW

Electrical capacity of power: 21.4 MW

Works performed: Engineering computations and detailed design

Investment value: EUR 65 million

Smeltė overpass. Gold Medal of the Product of the Year
Detailed design and production drawings.
READ MORE
Pedestrian and cycling bridge, the highest in Lithuania. Gold Medal of the Product of the Year
Detailed design and production drawings.
READ MORE
„Rail Baltica”
Conceptual design, technical design, working design and engineering supervision for the urban infrastructure part of the project.
READ MORE
Ignalina nuclear power plant
Storage and waste treatment facilieties equipment design
READ MORE
A2 motorway
Technical design and working design for ring junctions, slip roads and a pedestrian bridge.
READ MORE