Subscribe to the newsletter
Subscribe to TEC Group News.
Pedestrian and cycling bridge, the highest in Lithuania. Gold Medal of the Product of the Year
2016-01-01

Client: Alytus
Location: Alytus, Lithuania
Project period: 2016
Size: 240.5 m x 92 m
Works performed: Detailed design and production drawings
Investment value: EUR 8.2 million