Construction of new Trestle Overpass

Infrastuktūra
Infrastructure
Klientas
SC “Kauno tiltai”
Vieta
Rusnė, Lithuania
Laikas
2018-2019
Atlikti darbai

Reinforced concrete piled two-lane overpass of 421.7 length.

Reconstruction of Šilutė – Rusnė road segment from 2.4 to 7.36 km (construction of new road pavement and elevation of a road segment of about 1.8 km length nearby the overpass).

A footway and a bicycle path of 4.5 km length along the reconstructed road.

Suteiktos paslaugos

Concept / Detailed design  / Design of the architectural part of the structure

CONTACT US